BICSI-Designing Low Voltage Technology Infrastructure Spaces
DATE:
Wednesday, January 29, 2025
TIMES:
11:00 AM-12:00 PM EDT
LOCATION:
Online
INSTRUCTOR:
Glenn Collinge
Having the correct physical infrastructure in new and retrofit applications is a critical step for being able to provide the functionality needed for today’s low voltage systems. This applies to applications of low-voltage lighting, Edge computing, AV, IT and other applications. The technical changes to allow existing and future applications require new infrastructure as technology has changed so much in the last 5 years in everyday uses for corporate, medical, education and other areas. Designing and installing these enclosures, cable management and aesthetics as well will be discussed. · Define cable management solutions that are used in floor, wall, ceiling and furniture applications that are unobtrusive and meet the aesthetic requirements of the space. · How to design systems to their clients with the correct infrastructure and how that will improve user experiences. · Recognize the importance of a designing the correct products early in the design discussions to work with the applications with today’s technology, not what was used 10 years ago. · See options for replacing traditional locations for AV and IT products in your system designs!